![]() |
![]() |
| Home FAQs Technical Support Literature Request Distributor Finder Services |
Success StorySprint Corporate Headquarters
|
The positioning of the anchors is first done with a template. |
|
Anchor holes are then drilled into the stone. |
|
The holes are then filled with Bonstone® Structural Epoxy. |
|
Additional epoxy is then used for stone and stone bonding. |
|
For larger applications, a pneumatic gun is recommended as shown. |
|
Anchors are then inserted. |
|
The stone is then joined together. |
|
The stone is then clamped together until initial cure. |
|
Dry grinding the excess epoxy off the surface of the stone completes the bonding application (Original epoxy color matches are developed with dry-grind appearance). |
|
Final stone assembly. |
|
©2005 Bonstone® Materials
Corporation |